Electrification NZ

Data and sources

Inspect the figures behind the charts

Download chart-ready data or review every plotted value alongside its official source.

Dataset catalogue

Coverage and update dates refer to the values currently used by this site.

Whole energy system

MBIE
Data updated to
Last checked
Next update20 August 2026
Coverage

Annual renewable shares for electricity generation and total final energy consumption from 1990 to 2024.

Definitions and limitations

Electricity generation and total final energy consumption are different denominators. The final-energy measure includes direct renewable use plus electricity consumption allocated to renewables. Historical values follow MBIE's published indicator series; 2023 and 2024 endpoints use the latest Energy in New Zealand 2025 release and may be revised. The 2026 report is available, but this historical comparison retains the 2025 vintage pending reconciliation of differing final-energy renewable shares in the new overview and renewables chapters.

Annual electricity generation

MBIE
Data updated to
Last checked
Next update
Coverage

Total generation, renewable share, solar and geothermal electricity generation for 2025.

Definitions and limitations

Annual report vintage. These figures may revise earlier quarterly estimates and are not spliced into the quarterly chart. Renewable share refers to electricity generation, not total final energy consumption.

Electricity generation and demand

MBIE
Data updated to
Last checked
Next update10 September 2026
Coverage

Quarterly electricity generation and demand through March 2026.

Definitions and limitations

Generation groups follow MBIE's quarterly electricity tables. Other renewables combines biogas, wood, and waste heat; non-renewables combines oil, coal, and gas. Quarterly values retain the 11 June 2026 release vintage; the separate annual 2025 indicators use Energy in New Zealand 2026 and may incorporate revisions.

Wholesale electricity prices

Electricity Authority
Data updated to
Last checked
Next updateMonthly
Coverage

Monthly national demand-weighted final wholesale spot prices from January 2019 to August 2026.

Definitions and limitations

Prices are nominal New Zealand dollars per megawatt-hour and are weighted by electricity demand.

Grid-connected solar capacity

Electricity Authority
Data updated to
Last checked
Next update
Coverage

Operating grid-connected solar capacity and the announced 2026/27 project pipeline.

Definitions and limitations

Announced pipeline capacity is not yet operating. Projects can be delayed, changed, or cancelled.

Historical light-fleet electrification

Ministry of Transport via Figure.NZ
Data updated to
Last checked
Next update
Coverage

Historical light-fleet electrified share through February 2026.

Definitions and limitations

The series combines battery-electric and plug-in-hybrid light vehicles. It remains separate from the differently classified current NZTA snapshot.

Current vehicle fleet

NZ Transport Agency Waka Kotahi
Data updated to
Last checked
Next updateMonthly
Coverage

Current registered passenger-car/van and light-commercial fleet by motive power.

Definitions and limitations

Passenger means the NZTA Passenger Car/Van vehicle type. Light commercial means Goods Van/Truck/Utility with gross vehicle mass up to 3,500 kg or class NA. Electrified combines electric, range-extended electric, fuel-cell electric, and plug-in-hybrid motive types.

Process heat

EECA
Data updated to
Last checked
Next update
Coverage

Mapped process-heat demand and emissions across 713 sites.

Definitions and limitations

The database focuses on sites with fossil-fuelled primary heat equipment above 500 kW. Underlying site observations span multiple survey years, mainly 2021-2023.

Grid connection outlook

Transpower
Data updated to
Last checked
Next update
Coverage

Generation and load projects being delivered through Transpower's connection pipeline.

Definitions and limitations

Project counts and capacity are delivery-pipeline figures, not commissioned generation.

Generation investment pipeline

Electricity Authority
Data updated to
Last checked
Next update
Coverage

Generation investment pipeline status at October 2025.

Definitions and limitations

The broad pipeline is distinct from committed or under-construction projects; not all proposed capacity will proceed.

Grid-scale battery status

Electricity Authority
Data updated to
Last checked
Next update
Coverage

Operating, under-construction, and announced grid-scale batteries.

Definitions and limitations

Megawatts measure discharge power; megawatt-hours measure stored energy. Status categories must not be added as though all capacity is operating.

Renewable generation spill

Electricity Authority
Data updated to
Last checked
Next update
Coverage

Renewable spill, low-price periods, flexible demand, and batteries.

Definitions and limitations

Used to explain why some renewable output is not used when supply exceeds demand or network and storage limits bind.

Waiinu Energy Project

Fast-track New Zealand
Data updated to
Last checked
Next update
Coverage

Proposed integrated wind, solar, and battery project.

Definitions and limitations

Referral into the fast-track process is not approval or a final investment decision.

Very-high-temperature heat pumps

EECA
Data updated to
Last checked
Next update
Coverage

Demonstration support for industrial heat-pump projects at or above 85 C.

Definitions and limitations

The initiative offered co-funding for demonstrations; it is not deployed national capacity.

Solid-state hydrogen storage research

MBIE
Data updated to
Last checked
Next update
Coverage

Research including solid-state hydrogen storage materials at the University of Waikato.

Definitions and limitations

This is research funding, not a commercial storage project.

Solar on schools programme

Ministry of Education
Data updated to
Last checked
Next update
Coverage

Funded rooftop-solar rollout for up to 500 schools, including batteries at some sites.

Definitions and limitations

Programme targets and funding are not installed capacity. The first 80 to 100 schools are targeted for the 2026–27 summer rollout.

Demand-flexible heavy-vehicle charging

EECA
Data updated to
Last checked
Next update
Coverage

Co-funding round for shared heavy-vehicle charging hubs using smart charging, storage or demand flexibility.

Definitions and limitations

This is a demonstration funding programme, not an inventory of operating truck-charging hubs.

Two-way EV charging trials

EECA
Data updated to
Last checked
Next update
Coverage

Queenstown and proposed urban trials of vehicle-to-home, vehicle-to-building and vehicle-to-grid charging.

Definitions and limitations

Trials test technical and user behaviour in New Zealand conditions. They are not evidence of widespread compatible vehicles or commercial deployment.

Digital electricity system map

Electricity Authority
Data updated to
Last checked
Next update
Coverage

A sector map containing 56 possible, underway and longer-term digitalisation actions.

Definitions and limitations

The map is a collective vision and work programme, not a commitment that every listed action will be delivered.

Offshore renewable energy regime

MBIE
Data updated to
Last checked
Next update
Coverage

Proposed feasibility and commercial permit regime for offshore wind, wave, tidal and other marine renewable energy.

Definitions and limitations

The regime remains subject to the Offshore Renewable Energy Bill becoming law. Regulatory groundwork is not a consented generation project.

Efficient demand flexibility

EECA
Data updated to
Last checked
Next update
Coverage

Co-funding for commercial and industrial battery projects demonstrating demand flexibility and wider system benefits.

Definitions and limitations

The completed funding round does not show how many projects will reach commissioning or their aggregate capacity.

Superhot geothermal exploration

MBIE
Data updated to
Last checked
Next update
Coverage

Preferred-contractor selection for New Zealand's first exploratory superdeep, superhot geothermal well.

Definitions and limitations

The programme is exploratory. No commercial resource, capacity or generation date has yet been established.

OpenStar fusion research facility

New Zealand Government
Data updated to
Last checked
Next update
Coverage

Government loan support of up to $35 million for a specialised Wellington facility for OpenStar's next fusion machine.

Definitions and limitations

This is research infrastructure for an experimental fusion approach, not a power station or forecast electricity supply.

Methods and interpretation rules
  • Each visible series is tied to a named public source and coverage period.
  • Whole-system renewable shares use MBIE's annual indicators. Electricity generation and total final energy consumption have different denominators and should not be read as interchangeable measures.
  • Annual 2025 generation indicators use Energy in New Zealand 2026. Quarterly generation and demand retain the March 2026 quarter from the 11 June release; the next quarterly release is scheduled for 10 September 2026. Wholesale prices extend through August 2026.
  • The current transport composition is derived from NZTA's cleaned 30 June 2026 vehicle-level snapshot. The historical trend remains separate because its classification differs.
  • Process-heat figures describe EECA's mapped large fossil-fuelled heat sites, not every industrial heat load in New Zealand.
  • Outlook items retain precise statuses and are grouped into building, proposal and research horizons so operating, proposed, demonstration and frontier activity are not presented as equivalent.
  • The outlook project list is a curated set of current official examples, not a complete inventory of every New Zealand electricity or electrification project.
  • Political promises require manual review of official party sources before publication.